ADEMCO VISTA-250FBP Guide d'installation Page 32

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 136
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 31
VISTA-128FBP/VISTA-250FBP Installation and Setup Guide
3-10
power is lost.
Zone 974 (Primary Dialer Supervision) must be enabled in order for the backup dialer (or communications
device, if used) to communicate in the event that the primary dialer fails.
If a communications device is used as the primary dialer, then its supervisory zone must be enabled (e.g. 8XX,
where XX is the device address of the communications device.
U
L
The telephone line inputs have overvoltage protection in accordance with UL1459.
Reporting Formats
The system is shipped defaulted for Contact ID format. It is the only format capable of uniquely reporting all 250
zones, as well as openings and closings for all 250 users. This requires central stations to be equipped with the
MX8000 receiver. If you need to update your MX8000 receiver, contact your distributor.
The system supports ADEMCO Low Speed 3+1; 4+1; 4+2; Sescoa/Radionics 3+1; 4+1; 4+2; ADEMCO 4+2 Express;
ADEMCO High Speed; ADEMCO Contact ID Formats.
Vue de la page 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 135 136

Commentaires sur ces manuels

Pas de commentaire